Tag Archives: Lowell

Kidder Hill Wind 45 day notice documents

1-45-day-notice-and-project-description 2-proposed-wind-farm-scenario- 3-proposed-wind-farm-scenario- 4-proposed-wind-farm-scenario- 5-natural-resources-map 6-five-mile-reference-map 7-visual-simulation 8-wind-turbine-visual

Posted in Blittersdorf, Irasburg Wind | Tagged , , , | Leave a comment

Vermont ANR finds no violations at GMP Lowell Wind site

VCE received a second response from Vermont’s Agency of Natural Resources to our Investigation into the Stormwater System on Green Mountain Power’s Lowell Wind site. “Summary: Data collected for monitoring KCW Project water quality impacts indicated streams draining the project area … Continue reading

Posted in ANR, Green Mountain Power, Lowell, Water, Wind Energy | Tagged , , , , | Leave a comment

Vermont’s Agency of Natural Resources Response to VCE’s Investigation of GMP’s Lowell Wind

In July, 2016, VCE investigated the stormwater systems and ecological health of Green Mountain Power’s Lowell Wind site.  A reporter (not associated with VCE) sent the investigation to the Agency of Natural Resources.  On Friday, Nov. 4, 2016, ANR’s General … Continue reading

Posted in ANR, Green Mountain Power, Lowell | Tagged , , , , , | Leave a comment

VCE’s Investigation into the Environmental Health of the Lowell Mountains with Industrial Wind Turbines – July 2016

WATER 1.  The “wet” ponds are predominantly dry or are not holding the volume of water necessary to provide water quality treatment as required by the VT Stormwater Management Manual.  Further, it is highly probable that instead of flowing through … Continue reading

Posted in ANR, Green Mountain Power, Lowell, Uncategorized, Water, Wind Energy | Tagged , , , , , , , , | 6 Comments