Deerfield Wind Compliance Filings

July, 2008 2008-DFLD-KK-5, Noise Study Addendum

May 1, 2015. Blasting Plan. 2015-05-01 Deerfield Blasting Plan

May 15, 2015. IWA to PSB. WA-PostCPG-Comments-20150515-FINAL

June 1, 2015. DW Letter to PSB. 2015-06-01 Ltr to PSB re Compliance Filings

June 1, 2015. DW to PSB. Attachment 01 – Explanation of Modifications to Project Design Plans

June 6, 2015. IWA Comments to PSB. WA-SupComments150606

June 15, 2015, DW Response to Comments. 2015-06-15 Deerfield ltr to PSB re Reply to Comments

June 17, 2015 WA-motionEnlarget-150617

June 19, 2015. ANR Comments to PSB. 7250 Deerfield Wind Project_ANR Comments on 2nd Set of Compliance Filings by Petitioner_2015.06.19

June 30, 2015. IWA Comments to PSB.  WA-PostCPG2-20150630-FINAL-wAttachment. WA-PostCPG2-20150630-FINAL-wAttachment

June 30, 2015. DPS Comments to PSB. 0630_001

July 2, 2015. DW to PSB. 2015-07-02 Deerfield Ltr to PSB re 3rd Set Compliance Filings.  2015-07-02 Deerfield Ltr to

July 22, 2015. IWA Comments to PSB. WA-PostCPG-3-Comments-20150722

July 31, 2015. DW to PSB.  Reply to IWAG Comments re 2nd Compliance filings.  2015-07-31 Reply to IWAG Comments re

July 31, 2015. DW to PSB. 2015-07-31 Revised Blasting Plan

Sept. 3, 2015. DW to PSB.  2015-09-03 DW Ltr to PSB re M for Protective Order and Attachments

Sept. 3, 2015. 2015-09-03 DW Ltr to PSB in Response to Comments on 3d Set Compliance Filings

Sept. 22, 2015. IWA Comments to PSB. WA-PostCPG-Response-2015-09-22-FINAL

Oct. 21, 2015. DW to PSB. 2015-10-21 DW 4th Set Compliance Filings w. Non-Confidential Materials 

Dec. 8, 2015. DW to PSB.  2015-12-08 DW Ltr to PSB re Status of Compliance Filings