July, 2008 2008-DFLD-KK-5, Noise Study Addendum
May 1, 2015. Blasting Plan. 2015-05-01 Deerfield Blasting Plan
May 15, 2015. IWA to PSB. WA-PostCPG-Comments-20150515-FINAL
June 1, 2015. DW Letter to PSB. 2015-06-01 Ltr to PSB re Compliance Filings
June 1, 2015. DW to PSB. Attachment 01 – Explanation of Modifications to Project Design Plans
June 6, 2015. IWA Comments to PSB. WA-SupComments150606
June 15, 2015, DW Response to Comments. 2015-06-15 Deerfield ltr to PSB re Reply to Comments
June 17, 2015 WA-motionEnlarget-150617
June 19, 2015. ANR Comments to PSB. 7250 Deerfield Wind Project_ANR Comments on 2nd Set of Compliance Filings by Petitioner_2015.06.19
June 30, 2015. IWA Comments to PSB. WA-PostCPG2-20150630-FINAL-wAttachment. WA-PostCPG2-20150630-FINAL-wAttachment
June 30, 2015. DPS Comments to PSB. 0630_001
July 2, 2015. DW to PSB. 2015-07-02 Deerfield Ltr to PSB re 3rd Set Compliance Filings. 2015-07-02 Deerfield Ltr to
July 22, 2015. IWA Comments to PSB. WA-PostCPG-3-Comments-20150722
July 31, 2015. DW to PSB. Reply to IWAG Comments re 2nd Compliance filings. 2015-07-31 Reply to IWAG Comments re
July 31, 2015. DW to PSB. 2015-07-31 Revised Blasting Plan
Sept. 3, 2015. DW to PSB. 2015-09-03 DW Ltr to PSB re M for Protective Order and Attachments
Sept. 3, 2015. 2015-09-03 DW Ltr to PSB in Response to Comments on 3d Set Compliance Filings
Sept. 22, 2015. IWA Comments to PSB. WA-PostCPG-Response-2015-09-22-FINAL
Oct. 21, 2015. DW to PSB. 2015-10-21 DW 4th Set Compliance Filings w. Non-Confidential Materials
Dec. 8, 2015. DW to PSB. 2015-12-08 DW Ltr to PSB re Status of Compliance Filings