Category Archives: Irasburg Wind

Testimony by VCE to House Natural Resources, Fish & Wildlife Committee, Feb. 14, 2019

Click on each link to watch or read the presentation Agenda¬† Presentation with Slides Written testimony/narrative to go with the slides. ¬†The numbers refer to the page numbers on the slides. Video of Presentation with Q&A afterwards: https://youtu.be/T4-H76wM4jI   Advertisements

Posted in Act 250, ANR, Blittersdorf, Deerfield, DPS, Energy Planning, GMNF, Grafton Windham, Green Mountain Power, Irasburg Wind, Lowell, PSB, PUC, sheffield, Solar, Swanton, USFS, VCE, Water, Wetlands, Wind Energy | Leave a comment

Kidder Hill Wind 45 day notice documents

1-45-day-notice-and-project-description 2-proposed-wind-farm-scenario- 3-proposed-wind-farm-scenario- 4-proposed-wind-farm-scenario- 5-natural-resources-map 6-five-mile-reference-map 7-visual-simulation 8-wind-turbine-visual

Posted in Blittersdorf, Irasburg Wind | Tagged , , , | Leave a comment